| Lightning Protection Risk Assessment |
|
Lightning Protection Study is highly site-specific, with many designs unique to individual facilities and structures. Mitigation of the effects of lightning strikes is attempted through the deployment of a combination of exterior and interior defenses.
|
|
Objectives:
|
|
The objectives of the lightning protection study is to
|
- Review the existing lightning protection system against national and international standards
- Study of the maintenance aspects of the lightning protection system and suggest suitable corrective actions.
|
|
Scope of the study
|
|
The lightning protection study would be based on the following national and international standards. The study would also include review of existing lightning protection installation in the plant.
|
- Indian Standard 2309 – Code of Practice on Lightning Protection of Buildings & Allied Structures
- National Fire Protection Association (NFPA) 780
- Oil Industry Safety Directorate (OISD) 180
- British Standard on Lightning Protection (BS 6651)
- American Petroleum Institute (API) RP 2003 -Lightning protection Standard
|